August 3, 2020 – NovaWind JSC has launched the construction of Marchenkovskaya wind farm in the Rostov region. The total capacity of the planned wind farm will be 120 MW. The site will be equipped with 48 wind turbines (WT) with a capacity of 2.5 MW each, and their planned annual average energy output will be 402 GWh. The total volume of investments in the construction of the wind farm amounts to more than 16 billion rubles.
As of today, more than 40 units of construction vehicles and more than 100 workers and engineers are already working at the site. The static trials of bearing capacity of soils with bored piles were completed. The delivery of materials for foundation construction works has begun. Two concrete batching plants with a total capacity of 170 cubic meters of concrete mixture per hour were installed. Works on the excavation of foundation pits and reinforcement of future foundations of the wind farm are in progress.
For reference:
NovaWind JSC is a ROSATOM division for implementation of the wind power projects. In total, companies in the control circuit of NovaWind JSC will build wind power stations with a total capacity of 1GW until 2023.
Source: Press Service of NovaWind JSC